The Elsthorpe Road project started as urgent flood repair after Cyclone Gabrielle and grew into a full renovation. The owners saw the chance to update and strengthen their home, which turned the job into a major milestone for CJS Carpenters. What began as water damage recovery became a full redesign shaped by clear decisions and close collaboration.

The work included a new kitchen, a third bathroom, upgraded lighting, renovated existing bathrooms, and polished concrete floors across the home. Each choice supported durability, function, and a clean design. The result is a modern space planned for long-term use.

This project shows the standard CJS Carpenters aims to deliver in difficult situations. The shift from disaster recovery to full renovation produced a warm and practical home. The owners shared strong feedback about the process, noting Cameron’s attention to detail, clear coordination with trades, and steady support from the first cleanup to final handover.